Claims and disputes

A claim that is not notified in time often cannot be pursued at all. I help with claims during construction and represent clients in disputes before Dispute Boards (DAB/DAAB), in arbitration and before the courts.

What you get

Notices and claims

Notice of claim and fully detailed claim with supporting documents, within the contractual time limits.

Assessing the other party's claim

Analysis of a claim you have received and a draft response.

Representation before a DAB/DAAB

Referral of the dispute (Referral Notice), submissions and the hearing before the board.

Arbitration and courts

Representation before arbitral tribunals and courts, anywhere in the world: in Slovakia on my own, abroad as part of a team with a local law firm.

From claim to dispute

The procedure under the FIDIC Red and Yellow Books, 1999 edition. The numbers are Sub-Clauses of the General Conditions; a particular contract may amend them in its Particular Conditions.

20.1Contractor's claim 2.5Employer's claim 3.5Engineer's determination(determination) 20.4DAB decision(adjudication) 20.5Amicable settlement(negotiation) 20.6Arbitration(final award) 20.8No DAB in place 20.7Failure to comply with a decisionDAB CLAIM DISPUTE

How it works

  1. 1

    Assessment

    Time limits, the contract, correspondence and the documents available to you.

  2. 2

    Strategy

    Strength of the position, costs, time and alternatives, including settlement.

  3. 3

    Submissions

    Notices, claims and submissions prepared within the contractual and statutory time limits.

  4. 4

    Proceedings

    Representation before the Engineer, a DAB/DAAB, arbitrators or the courts.

I propose my fee in advance, based on the scope and stage of the dispute.

Who it is for

Contractors, subcontractors and employers. In disputes in which I have been appointed as an arbitrator or DAB member, I represent neither party.

Frequently asked questions

What is the time limit for notifying a claim?

Under Sub-Clause 20.1 of the Red and Yellow Books (1999), 28 days after the Contractor became aware, or should have become aware, of the event; the 2017 edition has a similar time limit in Sub-Clause 20.2. The Particular Conditions may amend it, so the specific contract must always be read.

What if the other party does not comply with a DAB decision?

Under Sub-Clause 20.7 (1999), a failure to comply with a final and binding decision may be referred directly to arbitration.

How much does it cost?

I propose my fee in advance, based on the scope and stage of the dispute.

Facing a claim or a dispute?

Tell me which contract it concerns and which time limits are running. Time limits for claims are short.