Projects and clients

Experience

I work on projects in nuclear energy, transport, water management and urban infrastructure – for employers, for contractors and as a consultant to project teams. I have worked on more than 15 FIDIC projects. The total value of the construction contracts I have worked on exceeds EUR 500 million, and I have represented clients in disputes worth more than EUR 10 million.

Selected projects

Nuclear energy

  • Completion of Units 3 and 4 of the Mochovce NPP
  • D4.7 Decontamination and demolition of the V1 NPP buildings, Jaslovské Bohunice
  • Shutdown and decommissioning of the V1 and A1 NPPs
  • Preparation of assets for a new nuclear source in Jaslovské Bohunice (investment plan, feasibility study)

Transport

  • Petržalka tram line, Bratislava – contract management (FIDIC Red Book)
  • Ružinovská radiála tram line, Bratislava – contract and tender documents (FIDIC Yellow Book), including the tender for site supervision
  • Karlová Ves – Dúbravka tram line, Bratislava
  • Zvolen – Pstruša expressway
  • Modernisation of the Poprad – Lučivná railway line
  • Integrated transport terminal in Trebišov

Energy, heat and waste

  • New heat and power source in Žilina (for the contractor consortium PPA CONTROLL – innogy)
  • Modernisation of the Zvolen heating plant
  • Modernisation of the OLO waste-to-energy plant, Bratislava (project manager's team for engineering and site supervision)
  • 2 × 400 kV Križovany – Bystričany power line (ELCON)
  • Renovation and modernisation of the navigation locks at the Gabčíkovo waterworks (Metrostav)

Culture and buildings

  • Reconstruction and modernisation of the Slovak National Gallery complex (approx. EUR 72 million)
  • Reconstruction of the Captain's House at Zvolen Castle

Long-term engagements

On most projects I work as part of the client's team or the project team, from drafting the contract through to resolving claims during construction.

2022 – 2025 · City of Bratislava

FIDIC consultant for major capital projects: contract management of the Petržalka tram line (FIDIC Red Book), including representation of the employer before the DAB (2 claims), the contract and tender documents for the Ružinovská radiála (FIDIC Yellow Book) and for its site supervision.

since 2014 · ENSECO, a. s.

Comprehensive legal advice, including management of the works contract for the operational units of the nuclear island at Mochovce NPP Units 3 and 4: variations, claims, amendments and dispute settlement, both towards the employer and towards subcontractors. Together with the contractor I took part in 4 rounds of extension-of-time negotiations with Slovenské elektrárne.

2011 – 2023 · Slovak National Gallery

Management of the works contract under the FIDIC Red Book (contract price approx. EUR 72 million) and comprehensive settlement with the contractor for the reconstruction of the SNG complex; documentation for the reconstruction of the Captain's House.

MH Teplárenský holding, a. s.

Settlement after the bankruptcy of the contractor modernising the Zvolen heating plant.

2009 · VÚJE, a. s.

Negotiation of the works contract for the operational units of the nuclear island at Mochovce NPP Units 3 and 4.

2008 – 2009 · JAVYS, a. s.

Carve-out of nuclear assets and their contribution to a joint venture for a new nuclear source in Jaslovské Bohunice, including the separation of real estate from the operating V1 NPP.

Clients

ENSECO · City of Bratislava · Slovak National Gallery · MH Teplárenský holding · Metrostav · PPA CONTROLL · Chemkostav · ELCON · JAVYS

I have trained staff of the National Motorway Company, the Slovak Road Administration, the City of Bratislava, JAVYS, JESS, Amberg Engineering, SIEA, the Ministry of Investments (MIRRI), water utilities and others. I lecture regularly for Verlag Dashöfer, FORUM MEDIA, Poradca podnikateľa, the Slovak Chamber of Civil Engineers, SOPK, ZSPS, KROS, kurzy.sk and skolenia.sk. Abroad, I delivered Contract & Tender Management training for Ashghal (Qatar) in Vienna (2023) and spoke at the FIDIC Asia Pacific Mid-Year Conference 2025.

Training →
“In helping us settle a dispute, Peter showed the ability to analyse the problem quickly, focus on the essential facts and bring practical win-win solutions for everyone involved. Thanks to his approach the ice was broken, we reached a settlement and avoided court proceedings.”
Ing. Vladimír Práznovský, CEO, ENSECO, a. s. (translated from Slovak)

Preparing a project or facing a dispute?

Tell me about the project and I will suggest an initial consultation.

peter@kotvan.sk