Notices and claims
Notice of claim and fully detailed claim with supporting documents, within the contractual time limits.
Service · disputes
A claim that is not notified in time often cannot be pursued at all. I help with claims during construction and represent clients in disputes before Dispute Boards (DAB/DAAB), in arbitration and before the courts.
Notice of claim and fully detailed claim with supporting documents, within the contractual time limits.
Analysis of a claim you have received and a draft response.
Referral of the dispute (Referral Notice), submissions and the hearing before the board.
Representation before arbitral tribunals and courts, anywhere in the world: in Slovakia on my own, abroad as part of a team with a local law firm.
The procedure under the FIDIC Red and Yellow Books, 1999 edition. The numbers are Sub-Clauses of the General Conditions; a particular contract may amend them in its Particular Conditions.
1
AssessmentTime limits, the contract, correspondence and the documents available to you.
2
StrategyStrength of the position, costs, time and alternatives, including settlement.
3
SubmissionsNotices, claims and submissions prepared within the contractual and statutory time limits.
4
ProceedingsRepresentation before the Engineer, a DAB/DAAB, arbitrators or the courts.
I propose my fee in advance, based on the scope and stage of the dispute.
Contractors, subcontractors and employers. In disputes in which I have been appointed as an arbitrator or DAB member, I represent neither party.
Under Sub-Clause 20.1 of the Red and Yellow Books (1999), 28 days after the Contractor became aware, or should have become aware, of the event; the 2017 edition has a similar time limit in Sub-Clause 20.2. The Particular Conditions may amend it, so the specific contract must always be read.
Under Sub-Clause 20.7 (1999), a failure to comply with a final and binding decision may be referred directly to arbitration.
I propose my fee in advance, based on the scope and stage of the dispute.
Tell me which contract it concerns and which time limits are running. Time limits for claims are short.